This tender closed on Fri 14 Aug 2026. Buyers often re-tender: get the next one.

Architecture & engineering tender · South East

Design for Longevity- Electrolyser Prototype Design

UK Fusion Energy · South East

Value£125,000as the notice states
ClosedFri 14 Aug 2026

Official description

The STEP Fuel Cycle is the subsystem responsible for recovering, purifying and supplying tritium to the STEP fusion reactor. Tritium is present in a variety of forms, phases and compositions, including tritiated water. Vapour-phase electrolysis techniques such as solid-oxide electrolysis have been identified as a suitable technique for processing small quantities of tritiated water. The scope is to deliver the conceptual design of an electrolyser system (electrochemical cell or stack).

The buyer’s own words from the official notice, shortened. Read the official notice

The notice

Procedure
Below threshold - open competition
Official notice
Find a Tender

What this buyer bought before

Tenders from UK Fusion Energy in engineering over the last two years, counted from the official notices.

7tenders in two years
£100k–£250kusual size
0open now
  • Civil and structural3
  • Architecture2
  • Other engineering work2

Open now, like this one

Facts from the official notice on Find a Tender. Page last updated Fri 20 Nov 2026. Contains public sector information licensed under the Open Government Licence v3.0.

14 days free, no card
then £35 a month + VAT

Start free trial